Reliable access to transformers is essential for keeping projects on schedule. Still, across the industry, the same issues appear time and again when organizations try to source them:
- Extended lead times that put projects at risk.
- Limited communication that creates uncertainty.
- Drawings that miss specifications, requiring revisions.
- Slow quoting that holds up early planning.
- Pricing that isn’t competitive, adding pressure to budgets.
- Little guidance in finding the right solution.
Each of these factors slows progress and increases costs. TTES was built to change that by creating a process that is clear, consistent, and dependable from the first quote to final delivery.
The process, step by step
Quotes in 48 hours
We provide custom quotes quickly — usually within 48 hours, and sometimes in as little as 24. If project requirements aren’t fully defined, we work with you to outline the right specifications before pricing.
Drawings within two weeks of PO
Within two weeks of receiving your purchase order, we supply detailed drawings. These include full explanations and a complete component list. Any revisions are handled promptly so production can begin without delay.
Production on an average 12-week timeline
Standard lead time averages 12 weeks. For smaller units under 5,000 kVA, production can be completed in as little as 4–5 weeks. All transformers undergo Factory Acceptance Testing, which can be completed in person or via video conferencing.
On-site delivery you can count on
On-site delivery averages 12 weeks, with 99% of projects meeting deadlines. Each unit includes a three-year warranty, and our service response network covers the U.S. and Mexico for ongoing support.
The results our clients see
Meeting project schedules often comes down to how quickly equipment can be sourced and delivered. TTES works to shorten those timelines and provide consistency across different types of orders.
Examples include:
- Three transformer sizes delivered in 17 weeks – The city of Cherryville, North Carolina, required multiple transformer sizes to support community infrastructure. All units were delivered within 17 weeks.
- 35 single-phase transformers delivered in 11 weeks – Greenwood Public Works needed reliable utility-grade transformers. TTES completed the project in 11 weeks, enabling the city to meet local demand without delays.
- 11 2500 kVA transformers delivered in under 18 weeks – A data center project required 11 high-capacity 2500 kVA units. Including time for drawing approvals, all transformers were ready to ship in 17 weeks.
Explore more examples in our case study section.
Conclusion
The transformer industry doesn’t have to operate on long delays and missed expectations. By redesigning the quote-to-delivery process, We have shown that faster timelines and reliable service can be the norm rather than the exception.
Whether it’s a municipality upgrading infrastructure, a utility meeting community demand, or a data center scaling capacity, organizations choose us for one reason: confidence that their equipment will arrive on schedule, tested, and backed by ongoing support.
Looking ahead, our goal remains the same — to keep projects moving by removing the barriers that hold them back.